Investor tools

Rehab Budget Estimator

Build a line-item rehab budget, add contingency and a contractor fee, and see how the money could be split into draws.

  • Line items with quantities and unit costs you can change
  • Contingency and contractor fee added for you
  • Suggested draw schedule and a printable scope list

The property

1.00 = example costs as listed. Try 1.15 for a pricier market, 0.90 for a cheaper one.
Cushion for surprises. 10% is a common starting point.
Use 0 if you manage the job yourself or bids already include it.
Replaces the quantities and unit costs below using the square feet, beds, baths and rehab level above.

Line items Example costs

Unit costs are rough starting points, get contractor bids. Change any quantity, cost or draw phase. Set a quantity to 0 to leave an item out.

Your estimate

Total rehab budget
$0
Cost per sq ft
$0
Contingency
$0
Largest single draw
$0
Budget by category
CategoryAmount
Suggested draw schedule
PhaseAmountShareRunning total

Rehab funds are usually released in draws after an inspection confirms the work for that phase is done, so plan to pay for each phase before it is reimbursed. The largest single draw is a rough guide to the working cash you may need. Your loan documents set the actual draw steps. Beltway Lending fix and flip loans can finance up to 90% of the purchase and up to 100% of the rehab, and we have options with both Dutch and non-Dutch interest (interest on the full loan, or only on funds drawn), if you prefer one.

Estimates only. Not financial, tax or legal advice, not a loan offer or commitment to lend, and not a guarantee of results. Rates and costs shown are examples or numbers you entered, not Beltway Lending's rates or terms. Actual terms depend on the property, the borrower and the loan program. Calculator terms

Have a deal? Let's talk it through.

Get a quote online or call our team.